Energy
Headquarters of Elektroprivreda Republike Srpske, the Trebišnjica hydro system and over 260 sunny days — Trebinje is the energy hub of the region.
Hydropower plants on the Trebišnjica
HET — Hidroelektrane na Trebišnjici a.d. (a subsidiary of ERS headquartered in Trebinje) operates the system built between 1965 and 1981: HPP Trebinje I with the Bileća reservoir, HPP Trebinje II with the Gorica reservoir and HPP Dubrovnik.
The “Upper Horizons” project adds three new plants with a combined 257 MW. Construction of HPP Dabar (160 MW, about 500 GWh a year) began in 2023 and completion is expected by the end of 2027.

Upper Horizons — new HPPs
Installed capacity (MW)
Source: Investment Profile 2025.
Solar power plants
Planned capacity (MW)
Source: ERS, concessions 2020–2025.
Opportunities for investors
Solar energy
1,800 kWh/m² annual irradiation — SE Trebinje 3 (53.6 MW, 85.5 GWh) is seeking a construction partner.
Hydropower
A basin with about 1,780 mm of rain a year — one of the wettest in Europe.
Energy efficiency
ESCO models, LED lighting and renovation of public buildings.
Learn moreServices and equipment
Maintenance, engineering and equipment for the energy sector.