1. Home
  2. Key sectors
  3. Energy

Energy

Headquarters of Elektroprivreda Republike Srpske, the Trebišnjica hydro system and over 260 sunny days — Trebinje is the energy hub of the region.

1,075MW
final capacity of the Trebišnjica hydro system
3,900GWh
average annual output (final stage)
30
energy companies
1,566
employees in energy

Hydropower plants on the Trebišnjica

HET — Hidroelektrane na Trebišnjici a.d. (a subsidiary of ERS headquartered in Trebinje) operates the system built between 1965 and 1981: HPP Trebinje I with the Bileća reservoir, HPP Trebinje II with the Gorica reservoir and HPP Dubrovnik.

The “Upper Horizons” project adds three new plants with a combined 257 MW. Construction of HPP Dabar (160 MW, about 500 GWh a year) began in 2023 and completion is expected by the end of 2027.

Hydropower plants on the Trebišnjica
257 MWUpper Horizons

Upper Horizons — new HPPs

Installed capacity (MW)

36 MW
61 MW
160 MW
HPP BilećaHPP NevesinjeHPP Dabar

Source: Investment Profile 2025.

Solar power plants

Planned capacity (MW)

53 MW
53,6 MW
73 MW
SE Trebinje 2SE Trebinje 3SE Trebinje 1

Source: ERS, concessions 2020–2025.

Opportunities for investors

Solar energy

1,800 kWh/m² annual irradiation — SE Trebinje 3 (53.6 MW, 85.5 GWh) is seeking a construction partner.

Hydropower

A basin with about 1,780 mm of rain a year — one of the wettest in Europe.

Energy efficiency

ESCO models, LED lighting and renovation of public buildings.

Learn more

Services and equipment

Maintenance, engineering and equipment for the energy sector.

Get in touch

Have a project or a question? The City of Trebinje investor support team is here for you — from the first idea to opening your plant.

Send an inquiry