Cost of doing business

Utility prices, rent and land development fees by zone, permit timelines and fees — transparent and in one place.

Utilities (average prices incl. VAT)

ServiceEURBAM (KM)
Water and sewerage€1.23/m³2.41 KM/m³
Waste collection — companies€0.18/m²0.35 KM/m²
Waste collection — public institutions€0.14/m²0.27 KM/m²
Electricity12.62 c€/kWh0.247 KM/kWh
Business landline, basic€9.81/mo19.19 KM/mo
Business internet (m:tel NetBIZ S)€34.69/mo67.85 KM/mo

Source: Investment Profile 2025 (2026 prices). Converted at the fixed rate €1 = 1.95583 KM.

Rent and urban land development fee

ZoneRent (KM/m²)Development fee (KM/m²)
I115.19138.53
II80.00129.28
III64.00119.32
IV48.0099.45
V32.0079.56
VI16.0059.66
Outside city zones—59.66

Rent base: average final construction cost of 1,599.90 KM/m² (zone I = 6%).

Land development fee by zone

KM/m²

Zone I138.53
Zone II129.28
Zone III119.32
Zone IV99.45
Zone V79.56
Zone VI59.66

Decision on the land development fee (2026)

For production plants in the Volujac Business Zone the City cuts rent by 99% and the land development fee by 25%.

Permits — timelines and fees

ProcedureTimelineAdministrative tax and fees
Location conditions5 days20 KM; fee e.g. business building up to 50 m² 100 KM, up to 100 m² 150 KM, 100–400 m² 200 KM, infrastructure 300 KM, petrol station 500 KM
Building permit5 days0.3‰ of works value (min. 20 KM); cadastre contribution 0.3% of the estimate
Occupancy permit15 + 8 + 5 days0.3‰ (min. 20 KM); technical inspection e.g. 2 KM/m² for business buildings over 100 m²
Conversion of agricultural land5 daysCadastral income × 500 (class I) to × 100 (classes V–VIII); temporary structures −50%
Entrepreneur registrationup to 2 days30 KM

Occupancy permit: 15 days technical inspection, 8 days report, 5 days decision.